170 horizontal rebuild
Rebuilding a 170 horizontal..
Replaced both left and right horizontal tips with Mc Farlane tips using 8 32 screws in place of rivets. The idea is that you can easily change out the tip if damaged, one thing is that if you operate a seaplane you need to put some corrosion protection on the nut plates and screws on…
There is an STC for these but it has long since become a floating STC. I installed these as a minor alteration but used the STC as my data for installation. It is a pretty simple sheet metal project but you have to be careful. I do have these louvers coming available soon as a…
Floor viewing window for swing loadsThis was a fun job, but like most metal working jobs it always takes longer than they say. It also takes a bit of thinking as you do the installation about how it fits, it maybe different than the drawing, or holes may not be able to go where they…
Removing a camera hatch in my 1953 Cessna 180 and installing a baggage door.Specializing in minor and major sheet metal repairs to Cessna 180 and Cessna 185 aircraft. Repairing control surfaces to major gearbox repairs as well as STC modifications or service bulletins. This shows a little of the removal of a camera hatch in my Cessna…
Ground loop, not a bad one but still took some time