Similar Posts
Horizontal tip replacement
Replaced both left and right horizontal tips with Mc Farlane tips using 8 32 screws in place of rivets. The idea is that you can easily change out the tip if damaged, one thing is that if you operate a seaplane you need to put some corrosion protection on the nut plates and screws on…
Beech Sundowner baggage door
B19 same as B23Sheet metal work is as much an art as a skill. Most of the time there is very little to guide you other than a picture, some references in the maintenance manual or parts manual. And of corse the AC 43.13 to reference to. What also counts I’d how the repair or…
Fuselage repair
It all starts with rivets and time.
Cessna 180 baggage door and more
Removing a camera hatch in my 1953 Cessna 180 and installing a baggage door.Specializing in minor and major sheet metal repairs to Cessna 180 and Cessna 185 aircraft. Repairing control surfaces to major gearbox repairs as well as STC modifications or service bulletins. This shows a little of the removal of a camera hatch in my Cessna…
Wing tip repair
Ground loop, not a bad one but still took some time
Cessna 182
Just was out replacing a spar carry through on a Cessna 182, the problem was found during an annual inspection the culprit was an interior headliner that was glued to the spar carry through and moisture was caught between the fabric and the spar. This was the first annual for my customer on this plane,…