Another Wing tip repair
Ground loop, not a bad one but still took some time
Removing a camera hatch in my 1953 Cessna 180 and installing a baggage door.Specializing in minor and major sheet metal repairs to Cessna 180 and Cessna 185 aircraft. Repairing control surfaces to major gearbox repairs as well as STC modifications or service bulletins. This shows a little of the removal of a camera hatch in my Cessna…
After removing the tail we found that an earlier replacement of the tail bulkheads with a later model 180 bulkhead, probably because of the plane going over on its back, was not done very well…….
When repairing a cowl I try to balance the repairs out and it is important to make the repairs look as if it is part of the original cowl or nice enough to make the cowl look better if not stronger and most important last. One thing is these cowl repairs are time consuming and…
There is an STC for these but it has long since become a floating STC. I installed these as a minor alteration but used the STC as my data for installation. It is a pretty simple sheet metal project but you have to be careful. I do have these louvers coming available soon as a…
One of the hardest parts about this job was removing the wings. I do not think they had ever been off and it took some heat, a 5x rivet gun, big hammer and a long brass rod but we finally did it. The owner found a used spar that passed an eddy current test, took…
It all starts with rivets and time.