Hanger fell in on this 180
Hope this will be a winter project, lots of sheet metal.
Hope this will be a winter project, lots of sheet metal.
11-25-2024 We have been working on this project for 2 years and it is finally coming together, just maybe we can finish this up by spring……It will be one of the nicest 170’s ever that is for sure.
Completed 9-30-2023 The great part about this rebuild is that I get to put in all the goodies along with an overhauled K, new baffling, prop over haul, battery forward, extended baggage, no more vacuum system, no more tach cable, Jump seats, all new glass, Selkirk insulation, and taking a hard…
Completed This 2-33 came in a while back, the fuselage had been covered, wings and control surfaces painted but the cockpit and controls had not been touched. With a new canopy frame, canopy, new rear door, rear window all new interior parts to fit it takes time. We disassembled all the controls cleaned the tubes,…
Bird strike and a Ground loop repair Cessna 170
This has been a project for an old friend of mine for over 20 years and we bought the project to finish it. The story goes that the 180 was wrecked in Alaska on floats when the pilot failed to make it off a lake and it was bought some time later from out of…
Sold 6-1-21The first step has been to get to know the project airplane and after more than 30 hours of flying since I picked the airplane up in Mississippi I have got my to do list going. One thing you have to pay attention to before you buy is the condition of the aircraft and…