Selkirk center tunnel cover
Selkirk tunnel install
Selkirk tunnel install
Just was out replacing a spar carry through on a Cessna 182, the problem was found during an annual inspection the culprit was an interior headliner that was glued to the spar carry through and moisture was caught between the fabric and the spar. This was the first annual for my customer on this plane,…
Currently working on a ground loop repair to a Cessna 170B wing. If you watch you will see the three measurements for twist, the tool is made such that it should always be zero, the inboard, the middle, and the tip. You can see the twist is out by .7 which means it has only…
Replaced both left and right horizontal tips with Mc Farlane tips using 8 32 screws in place of rivets. The idea is that you can easily change out the tip if damaged, one thing is that if you operate a seaplane you need to put some corrosion protection on the nut plates and screws on…
Floor viewing window for swing loadsThis was a fun job, but like most metal working jobs it always takes longer than they say. It also takes a bit of thinking as you do the installation about how it fits, it maybe different than the drawing, or holes may not be able to go where they…
B19 same as B23Sheet metal work is as much an art as a skill. Most of the time there is very little to guide you other than a picture, some references in the maintenance manual or parts manual. And of corse the AC 43.13 to reference to. What also counts I’d how the repair or…
It all starts with rivets and time.
These door I modified using a Beech Sundowner door latch, works really well and it is new. After 60 years of opening and closing those old latches just wear out and there seems to be no good option. New parts are hard to find and old used parts are just that. This is a good…
End of content
End of content